Day To Day Track Maintenance (1951)
(Staff Instructional : Permanent Way Series)

Part 1: Plain Line
32 minutes

A film giving instruction in the normal maintenance tasks which have to be performed by a permanent-way gang of four men. It shows how all types of fastening on both bullhead and flatbottomed track are maintained; details the maintenance of rail joints; shows how 'hanging' sleepers should be repacked, and deals with the preservation of correct cant and alignment on curves.

Part 2: Switches And Crossings
20 minutes

Continuing the study of the normal tasks performed by a permanent-way gang, this film deals with the maintenance of switches, common crossings and obtuse crossings. These are the fundamental units from which all track layouts, however complicated are built up.

16mm & 35mm


Return to Main Index